Looking for collaboration for your next project? Do not hesitate to contact us to say hello.
Honourable Supreme Court of India Order and Writ Petition (C) no.375 of 2012...
View MoreHonourable Supreme Court of India Order and Writ Petition (C) no.375 of 2012...
View MoreHonourable Supreme Court of India Order and Writ Petition (C) no.375 of 2012...
View MoreHonourable Supreme Court of India Order and Writ Petition (C) no.375 of 2012...
View MoreHonourable Supreme Court of India Order and Writ Petition (C) no.375 of 2012...
View More
The pollution control measures are taken at the points of origin, in transit and
also at the end of the pipeline by providing collective treatment prior to its
final disposal.
CETP was commissioned in 1997. In 2001, All wastewater generated in the estate
were linked to CETP to ensure that environment is protected.
VGEL set up a common solid waste management site in 1999 and in year 2000,
commissioned first cell of Secured Landfill Constructed as per German Design
based on asphalt-concrete base liners. VGEL provided the facility for
collection, transport, storage and disposal of hazardous solid wastes at this
site and a small incineration system was added in year 2002. In the expansion
phase, for additional cells, Geo Membrane-Geo textile liner system was adopted
as per CPCB guidelines.
Based on a year long monitoring for ambient air and samples collected from 20
stations, an Action Plan was prepared to improve air quality in the estate to
reduce the vehicular emission load, a program to improve traffic decongestion
and check level of emissions from vehicles in cooperation with local
administration and RTA
Under a comprehensive monitoring program trained operators I equipped with
dedicated mobile communication, monitor mobile communication, monitor entire
Estate (24’7); draw samples of effluent from outlets of units. These samples
are analyzed at three QC labs of the company and any aviations in norms are
e-mailed to units for appropriate corrective measures. Appropriate action is
initiated against - consistent defaulters.
Monitoring also includes sampling of ground water from 10 representative
tube wells within the estate and 10 wells on periphery of estate.